PAST PROJECTS

We give each project we work on the personalized attention it deserves. We work side by side with our clients in order to understand their ideas and accommodate their concerns, while adhering to the agreed-upon budget. Check out some recent projects below and get in touch for more information.

WhatsApp Image 2021-09-08 at 16.03.33.jpeg

W1, PARK LANE, 55 Park Lane Residents 

While working on this project, we were very poignant about the materials and footprint of our work. We worked together with the client in order to manage their expectations and deliver the kind of results they desired. At The Stark, our goal is to bring our client’s vision to life while working with them every step of the way.

image8.png

CR8, Purley

Full renovation to a 4 bedroom house in Purley, London. Including new bathrooms, kitchen, window, and converting of garage into an extra room with heating and plumbing. A new drive waywas installed cleaned and measured to the fitting, shown in the images 

WhatsApp Image 2021-09-08 at 16.05.27 (1).jpeg

TW18, VIRGINIA WATERS, 46 St David Drive

This project involved a lot of compliance measures to make sure we followed industry standards adequately. Successfully completed on time and within budget, it’s a great example of delivering on our promise of quality work while ensuring absolute client satisfaction. Want to learn more about similar projects? Get in touch today.

WhatsApp Image 2021-09-08 at 16.00_edited.jpg

TW18, EGHAM, 9 St David Drive

Full renovation of a 7 bedroom property in TW18, St David Drive. New bedroom, bathrooms kitchen and flooring throughout the house, we also detailed and cleaned both drive way and garage. Exterior works was also done on the front of the house, where windows frames were, walls painted and followed clients design with out design consultation. Plumbing electrical work and joinery was done across entire property 

WhatsApp Image 2021-09-08 at 17.53.56.jpeg

W2, Paddington, 7 Raynham Court

4 bedroom flat in the heart of Paddington 5 minute walk from Hyde Park. The apartment was renovated for a high value rental property with luxury kitchen and bespoke hand made tile and wood flooring. The project was followed through with our interior design consultation and fitted in preparation for the high value tenant. All rooms, kitchens, hallway and bathrooms were met with high standard and new modern design 

a6604703-c6ab-4ed2-90af-097a198a6d6a.jpg

W2, PADDINGTON, 117 The Quadrangle

If you’re looking for a certified contractor to manage a really complex job, consider this project a testament to our abilities. We managed to deliver excellent results on schedule and under budget. We worked closely with the client to understand their needs and preferences, and the successful outcome speaks for itself.

da9ceeed-f989-4868-b13f-2a41e05225bf.jpg

W2, Paddington, 32 Raynham Court

This project involved a lot of compliance measures to make sure we followed industry standards adequately. Successfully completed on time and within budget, it’s a great example of delivering on our promise of quality work while ensuring absolute client satisfaction. Want to learn more about similar projects? Get in touch today.

Click to View More
IMG_1438.JPG

W2, MARYLEBONE, 7 Tichbourne Row

If you’re looking for a certified contractor to manage a really complex job, consider this project a testament to our abilities. We managed to deliver excellent results on schedule and under budget. We worked closely with the client to understand their needs and preferences, and the successful outcome speaks for itself.

WhatsApp Image 2021-09-08 at 15.37.35.jpeg

SW19, WIMBLEDON, Heath Rise

While working on this project, we were very poignant about the materials and footprint of our work. We worked together with the client in order to manage their expectations and deliver the kind of results they desired. At The Stark, our goal is to bring our client’s vision to life while working with them every step of the way.

Screenshot_20210904-152216_Gallery.jpg

W2, LANCASTER GATE, Spire House

Conversion of a Church into modern new apartments was held in Lancaster Gate. The renovation and conversion took a floor of the church into a new 3 bedroom apartment. Works undertook, where flooring, painting, re-designing floor plan and creating an open space for both living space and kitchen. New bathrooms and kitchen, bedrooms with designed wardrobes bespoke to size

WhatsApp Image 2023-09-09 at 15.06.33.jpeg

SW10, Chelsea Harbour, The Belverde

Repairs only. 

Old flat and apartment repairs held at Chelsea harbour, small details for electrical work and plumbing, joinery and carpentry. Painting and decoration was also held